고압 천연가스 팽창기 도입에 대한 열역학적 해석
김춘성, 박일환, 하종만 · 대한설비공학회 하계학술발표회 논문집 · 2010
The expansion work that is wasted through the irreversible expansion through the PC valve of decompression process of the natural gas governor station can be recovered by replacing the process by an isentropic expansion. The energy and exergy analyses for the two decompression process models of power producing and current decompression process model are presented. Analysis results showed that the exergy by gas supply is 56.29%, the exergy by producing power is 32.12 % in case of preheating system and 22.52% in case of non-preheating system. The dead exergy at the PCV is generated much more.
Cited by 0 works.