고속철도 강교량의 총기대비용 최적설계

조효남, 민대홍, 조준석 · The Royal Society of Chemistry’s Journals, Books and Databases (The Royal Society of Chemistry) · 2001

In this paper, an optimum design model for minimizing the life-cycle cost (LCC) of high-speed railway steel bridges is proposed. The point is that it takes into account service life process as a whole, and thus the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs, expected strength failure costs and expected serviceability failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. By processing the optimum LCC design the effective and rational basis is proposed for calculating the total LCC and the sensitivity analysis of LCC is performed. Based on a numerical example, it may be positively stated that the optimum LCC design of high-speed railway steel bridges proposed in this study provides a lot more rational and economical design, and thus the proposed approach will expedite the development of new concepts and design methodologies. \n \n 본 연구의 목적은 고속철도 강교량의 전 공용과정의 초기비용(설계비용, 개통전 검증재하시험비용, 건설비용) 및 유지보수비용과 기대파손비용 등을 포함하는 LCC에 근거한 최적의 비용함수모형을 이용하여 고속철도 강교의 최적설계에 적용. 분석하는 것이다. 특히 고속철도 교량과 같이 건설비용뿐만 아니라 장기적인 유지관리가 매우 중요한 구조물의 경우에는 초기비용 이외에도 교량의 유지관리, 교통의 원활한 소통 또는 적체 등에 따른 비용, 교량의 손상에 따른 보수보강 및 교량의 해체. 재건설 등 추가적인 비용의 영향이 크므로 이러한 일련의 고용간 총기대비용(Expected Total Life Cycle Cost : LCC)을 설계단계에서부터 체계적이고 합리적으로 고려하고자 한다. 본 연구에서 제안한 방법 및 절차는 허용응력설계법에 의한 구조적 파손확률과 구조적 파손비용 및 총기대비용을 설계단계에서 효율적으로 고려함으로써 고속철도 강교량의 공용간 LCC 분석에 근거한 기존의 설계방법보다 합리적이고 경제적인 차세대 최적설계법으로 기대된다.

Cited by 0 works.

Authors