초저온 저압 펌프의 설계오류에 의한 이상 진동 진단
구동식, 이정환, 김학은 et al. · 대한기계학회 춘추학술대회 · 2007
Imported Liquefied natural gas is transported to ground storage tanks via pipeline using cargo pump on the LNG carrier vessel. In LNG receiving terminal, LP LNG pumps are installed in the storage tanks and supply the LNG to secondary pumps with 8bar. So LP LNG pumps should be maintaining stable conditions to manage the LNG in stock. In this paper, to find out the cause of abnormal vibration at LP LNG pump, vibration analysis has been performed. Therefore, it was estimated and confirmed that random low frequencies were originated from fluid instabilities due to the inducer bolt being loosed because of the thermal expansion difference between bolt and other part in the cryogenic fluid. So, to prevent the looseness of inducer bolt, the dimensions of inducer bolts are modified. After modification, low frequency bands could be disappeared and pumps could recover its original performance characters.