지역별 예비력 제약과 융통전략을 고려한 발전기 예방정비 계획 해법
朴永秀, 金眞鎬, 朴俊灝 · 2007
This paper presents a new generating unit maintenance scheduling algorithm considering regional reserve margin and transfer capability. Existing researches focused on reliability of the overall power systems have some problems that adequate reliability criteria cannot be guaranteed in supply shortage regions. Therefore specific constraints which can treat regional reserve ratio have to be added to conventional approaches. The objective function considered in this paper is the variance (second-order momentum) of operating reserve margin to levelize reliability during a planning horizon. This paper focuses on significances of considering regional reliability criteria and an advanced hybrid optimization method based on PSO algorithm. The proposed method has been applied to IEEE reliability test system(1996) with 32-generators and a real-world large scale power system with 291 generators. The results are compared with those of the classical central maintenance scheduling approaches and conventional PSO algorithm to verify the effectiveness of the algorithm proposed in this paper.
Cited by 0 works.