작업구역의 합리적 분할에 의한 택트공정관리 개선
정영권, 윤유상, 서상욱 et al. · 대한건축학회 학술발표대회 논문집 - 구조계 · 2003
The purpose of this study is to increase the operational efficiency of Tact Planning and Scheduling through effective labor control based on fairly reasonable creation of work area. The main result of the study are as follows: 1) Specific section of work area for electric work lead to no division of zone between internal residence area and bathroom. And designate the work area of each floor so that it would manage labor control effectively. 2) When it comes to equipment work. It set up work area according to floortaking account into more frequent unit work comparatively than floor work. The study recommends that. As a future research, eventually aims at establishment of integrated system of labor control Tact Planning and Scheduling by combining respectively divided system into one.
Cited by 0 works.