건물 설비시스템의 측정 및 조사에 의한 적정용량 산정방안
정용효 · 한국생활환경학회지 · 2001
The mechanical designers has been utilized the Japanese design data for the building mechanical system design or data applied previously by the senior engineer without any consideration of Korean situation owing to the shortage of the proper data available in Korea. Most of buildings have the excessive equipment capacity, because they have no conviction of design data. And mechanical system designers do not reflect the design results to the next design after the end of mechanical design. So excessive safety factor is applied at the schematic design phase of the buildings. Excessive safety factor is the major reason to increase the initial cost of the building construction. In this study, building facility and management survey was carried out and effective method for the optimal design was studied. The survey items were cooling energy use, interview with building operator.
Cited by 1 works.