서울메트로 전력케이블 노후화 특성에 관한 연구
김균식, 신동남, 배영진 et al. · 한국철도학회 학술발표대회논문집 · 2010
Seoul Metro has been building additional power facilities in a limited area such as Optical Communications, Platform Screen Doors for the comfortable transportation environment since the opening of #1 metro line in 1974. It is essential to study about power cable that can supply ample power Seoul Metro had replaced the power cable that was built with # 1 metro line with new cables but it is urgent to replace the power cable which was builtin 25 years ago with #2-4 metro lines. To avoid replacing all power cables at the same time, it is necessary to figure out the replacing orders among cables that was built with metro lines. This study is intended to inspect and analyze the characteristics of its deterioration in a wide scope the High Voltage Distribution Metro line Cables as their maximum endurance year is near. They were built with metro lines between Substations and Transmission Lines, Substations and Electrical rooms, Electrical rooms and Electrical rooms. This study shows the tendency of deterioration of power cables by analyzing loading capacity, loading current, rail condition and operating condition.
Cited by 0 works.