연직배수재 타설시 발생되는 스미어 죤의 평가
김홍택, 황정순, 김승욱 et al. · 한국지반환경공학회 학술발표회논문집 · 2006
When mandrel is penetrated for vertical drainage construction in soft ground, the ground is disturbed and excess pore water pressure dissipation time is delayed because permeability of soft clay ground decreasing. Hence, consolidation time is influenced. In this research, measured the process of excess pore water pressure before and after mandrel installation each other different shape's mandrel penetration using model test. Also, estimated the range of smear zone based on permeability and horizontal coefficient of consolidation which were measured data during model test.
Cited by 0 works.