자갈궤도 궤도구조 갱환을 위한 기계화 시공방안
정요운, 최흥수, 윤병현 et al. · 한국철도학회 학술발표대회논문집 · 2014
As the industrial development is speeding up, high speed and the volume of distribution are rapidly increasing, and this is causing the continuous destruction and the deterioration of the ballast track. The Gyeongbu High Speed Railway Phase I section (Gwangmyeong~Daegu) which opened in 2004, has been performing the ballast replacement work for the worn out ballast track since 2007, and maintenance costs are expected to increase later. To solve these kind of issues, we are analyzing an overseas case of track improvement construction method and doing a research study on a subject of track structure improvement technology for the ballast track such as finding a way to reduce the domestic ballast track maintenance costs and how to improve the ballast track during the night break time.