철도터널의 굴진장 증대 시 안정성 평가 및 경제성 검토
김선홍, 김기림, 김찬동 et al. · 한국철도학회 학술발표대회논문집 · 2012
Excavation and muck disposal costs account for approximately 50% of the tunnel construction costs. Thus there were studied various methods decreasing the excavation and muck disposal costs. In case of tunnel, the intuitive methods for excavating efficiency increment is cost reduction by excavation span increasing. But excavation span increasing is restricted by technical constraints and tunnel stability under blasting excavation, muck handling equipment, operations, and the environment. Therefore applied the increment of excavation span, it is important that determinate the proper excavation span including solutions for the problems given above. In this paper, we researched the proper excavation spans through tunnel stability and Economic Analysis about the excavation span increasing.
Cited by 0 works.