풍력 터빈의 피치 게인-스케쥴링과 계단응답 기초연구
임채욱, 조준철 · 대한기계학회 춘추학술대회 · 2011
Pitch control is very important in wind turbine above rated wind speed. And pitch gain-scheduling is essential due to some engineering points. In this paper, 2-mass model for 2㎿ wind turbine is considered and pitch control with gain-scheduling is applied and simulation results for step wind speed input are presented.
Cited by 0 works.