대청댐 보조여수로 볼랜드식 어도수문 시공·운영사례
이정구, 곽해춘, 유능환 et al. · 한국강구조학회 학술발표대회 논문집 · 2014
Considerng recent unusual weather changes, construction of the Auxiliary Spillway will secure the stability of Daecheong Dam and protect the lives and property of people. The Steel equipment in Daecheong Dam Auxiliary Spillway can be largely divided into Emergency Spillway Steel Equipment and Fish-way Steel Equipment. Fish-way Gate B1.0m×H3.0m×2ea(upper pool), B2.0m×H1.6m×1ea(bottom pool). The Borland Fishway is operated in four stages.(①Attracting the fish ②Filljng ③Exit of the fish ④Emptying)
Cited by 0 works.