인천대교 건설에 적용한 토목섬유 현황과 그 성과
조성민, 권재봉, 박상일 · 한국지반신소재학회 학술발표회 · 2008
Many kinds of the geosynthetics have been utilized for the construction of 18.25 km long incheon bridge. Sand filled poly-ethylene geotextile tubes were installed as the cofferdam of the temporary access road for main bridge constructions. There were difficulties in installation of the geotextile tube on the soft tidal flat(forehore) due to 9.27m differences in the water level between ebb and flow. Hydraulic pumping of sand mixed water to the tube through multiple injection ports gave advantages to reduce the construction time and to maximize the tube size after the injection completion. And geotextile mats made of natural fiber, or synthetic fiber(PP, PET) were used as surface drainage layer between the original ground and the embankment. PET mats also has the function of embankment reinforcements. Prefabricated vertical drain method using geosynthetic filters and cores has been applied to promote the consolidation of the clayey ground under the embankment for roads and abutments. And besides Expanded Poly-Styrene(EPS) blocks will be used as the light embankment material behind the abutment of the bridge on the soft subsurface. We utilized the EPS block as a casting mold for concrete placements of the inclined member of the bridge structure as well.
Cited by 0 works.