도시철도 편의시설 설치공사의 적산방식 개선방안 연구
김만화, 김정수, 최철수 et al. · 한국철도학회 학술발표대회논문집 · 2014
This study analyses the problem of historical cost data integral system through convenience facility locating work cases and suggests the direction to improve. 19 constructions over 2008-2012 conducted by Seoul Metropolitan Rapid Transit Corporation were analyzed, compared to the actual cost to Construction Standard Production Unit system(CSPU) in the second half of 2013. Historical cost data integral system is one of the ways to estimate cost system regarding representative and universal work classifications based on contract price that Korea Institute of Construction Technology announces twice a year, which has been introduced in 2004 and gradually expanded to apply to more than 1950 work classifications in the second half of 2013. The subject of application is construction project over the estimated price of 10 billion won. It was calculated the estimated cost based on historical cost data even though for the constructions under 10 billion won, but Construction Standard Production Unit system(CSPU) is considered more appropriate in terms of practicality. In addition, extra cost depending on topography or other conditions(narrowness, noise, vibration, etc.) should be applied clearly in order to prevent poor construction by providing fair price, secure quality as well as stability of the urban rail construction.
Cited by 0 works.