작업부하 산출을 위한 캡쳐 데이터의 수집

채성호 · 대한건축학회 학술발표대회 논문집 - 구조계 · 2005

This paper discussed on the management of physical workload in building works with motion capture data. Motion capture data was used for control of a worker model in virtual reality system, and calculation of the action category in OWAS method. The authors estimated the workload in partition works with virtual construction site. The installation procedure is divided into task breakdowns and measured the 3-dimensional position of the 19-body parts. The differences between the calculation resualt and the observation were evaluated, and it was clarified that the method is applicable to the decision in work management.

Cited by 0 works.

Authors