신규장비 적용을 통한 한국형 기동헬기 블레이드 생산공정개선
Young Jin Kim, 박차환, 김홍주 et al. · 2013
This paper contains a review of problems in the localized blade manufacturing process through KUH program and research for improvement of it. Contrary to development, mass production needs reliable process due to the long period of supply. The main process of blade manufacturing(Lay-Up, Curing) accepts new equipment(Robot, Heatmold) for improvement of it. And then, the evaluation is performed. Additionally, it is proven that blade which is made by the new process is suitable for mass production by conducting a performance test in the development phase.
Cited by 1 works.