The Geoguem bridge has some remarkable points in the structural and constructional aspects. As for size, it has 480m main span length, so it is the largest composite cable stayed bridge in Korea. It has composite warren truss deck structure, which has somewhat large flexural rigidity. The large flexural rigidity makes bundle type cable arrangement be applicable. But regular balanced cantilever method is not acceptable for the bundle type cable arrangement because 36m-long segment without cable is too long for the cantilever system. So the erection method using jackup barge is applied, this method makes stable construction without the cantilever stage.