[미발표] 카린시안 적용구간 지보패턴 설계 사례

김영덕, 신현강, 임상만 et al. · 한국철도학회 학술발표대회논문집 · 2012

Since the site elevation of ○○ Railway Depot was planned to separate 5~6m from the Top End of main line of ○○ Tunnel, it was necessary to insure the tunnel stability at a shallow depth. Hence, Caninthian Cut and Method was applied to prevent the excessive slope cut of Cut and Cover tunnel section and solve the high cost problem of reinforcement method. The construction sequences are as follows; First step is to excavate the soil cover of the Tunnel. Then, the arch crown concrete structure is constructed and back filled. The rock grade was measured considering the site characteristic, that is, fault fractured zones of the specific sections. The validity of support patterns of Caninthian Cut and Cover Method was evaluated comprehensively regarding previous construction cases and numerical analysis results.