Оптимизация диаметра лифтовых труб на поздней стадии разработки газовых месторождений

Николаев Олег Валерьевич, Гереш Галина Михайловна, Харитонов Андрей Николаевич et al. · Вести газовой науки · 2014

This paper, on the basis of recent native works, describes the analysis of various aspects of using flooded well operation technology such as lift pipe replacement. Three criteria of diameter optimization are identified: on the basis of the maximum yield, maximum production volume and maximum period of stable well operation. A conclusion is made on the basis of criteria analysis that in most practical cases it is feasible to replace tubes, aiming at achievement of the maximum gas production volume, because this criterion ensures pressure loss minimization in the well bore on one side and maximum gas recovery of the reservoir on the other side. All calculations were made using the method of conjugate elements with the use of experimental data received in Gazprom VNIIGAZ LLC in different years. Hydrodynamic models were developed on the basis of experimental results. They allow to calculate process parameters of well operation after lift pipe replacement. Thus, they define the impact of the lift pipe diameter: • on the parameters of work of the «reservoir -well flowline» system; • on the minimum permissible yield; • on the maximum permissible pressures at the gas processing facility and at the wellhead; • on the abandonment pressure in reservoirs with varying productivity; • on the total gas production volume. The improved calculation methodology presented allows in each specific case to evaluate the results of lift pipe replacement and define the most efficient value of its diameter. Recommendations for lift pipe replacement in the course of further field development (up to 2025) are given by the example of one major field, and it is demonstrated that most of wells in Cenoman gas deposits of the Tyumen Region require replacement of lift strings with strings with a smaller diameter.

Cited by 0 works.

Authors