공공 건설공사 중 부도에 따른 공사지연 방지 방안

김백용, 조영준, 구교진 et al. · 대한건축학회 춘계학술발표대회 논문집(구조계) · 2004

The purpose of this study was to reduce the factor of construction delay in the owner's aspect by analyzing the actual condition of field supervision positively such as construction delay sample and process at the distressed company's construction site. As we analyze the examples of construction delay and reopening into various types, to minimize construction delay after the dishonor of a contractor we propose Cooperation and reliance fixing between the contract parties through the improvement of order method, Contracting system and Construction management system.