해저시설물 건설을 위한 국내외 수직구 설계기술에 관한 연구
신영완, 박상찬, 사공명 · 한국지반환경공학회 학술발표회논문집 · 2006
A shaft to access to a deep parallel tunnel is necessary to construct an undersea tunnel linking land to land, an island to land and an island to island, and subway tunnel and cable tunnel in metro. However, the design guide line for a shaft is not established in our country. Therefore, the shaft has been designed and constructed by various loads and design methods. A domestic and overseas shaft design technology is investigated in this study. Methods to evaluate the design loads are investigated by dividing ground into soils and rocks. Structural design methods of a shaft lining are gone through. The detailed design methods are not described on a guide book in Europe and the North America. In Japan, more specific guides are written in design specification of the various agencies. In Korea, an active earth pressure in plane strain condition or in-situ stress condition on soil layer is used. Also, an active earth pressure in plane strain condition is used or any pressure is not often considered on rock layer. Besides an active earth pressure in plane strain condition or in-situ stress condition on soil layer are used, three dimensional earth pressure considering arching effects is applied for shaft design in overseas countries. Also, for the most part, the equilibrium loads considering rock-support interaction are used in rock layer. In Japan, 10% to 20% eccentric load of the sum of ground load and water pressure is applied.
Cited by 0 works.