지하골조 관련 주요 공법 비교 및 개선 연구

유상연, 이동훈, 김선국 · 한국생태환경건축학회 학술발표대회 논문집 · 2008

As it is closely related to reduction in construction time, efficiency, workability (feasibility) and quality of a construction work, the choices regarding wall-retention methods and subterranean frame works are critical at the designing stage. Through numerous experiments in practice, many methods in those areas such as S.P.C. method, T.S.C method, E.S.D method, M.H.S methods, and B.R.D. method have been introduced and now widely used in the construction sites throughout the world. The goal of this study is to compare the strengths and the weaknesses of each wall-retention method and subterranean frame work mentioned above, and based on that analysis, this study will offer the authors' view regarding the future development in the subterranean frame work.