백라이트 재 작업 일정계획
주운기 · 대한산업공학회 추계학술대회 논문집 · 2008
This paper considers a single machine scheduling problem. The machine processes given multiple jobs and then reworks the defected jobs resulted from the first work. The objective is to find an optimal schedule which minimizes makespan or total flow time. For minimization the makespan, this paper characterizes an optimal sequencing rule. By the way, this paper suggests to use a heuristic algorithm for minimization the total flow time even though two properties on the optimal solution are derived.