Модернизация и замена компрессорного оборудования на газоперерабатывающих комплексах компании ОАО «Сибур»
Д Р Бикбулатова, В Д Родионов, О Л Кузьмин et al. · CyberLeninK (CyberLeninka) · 2012
On the basis of Program, adopted in 2008, for the increasing of capacity of the oil gas treatment at JSC”Sibur” facilities, plans for modernization of technological processes of the company and for retrofitting of the equipment being in operation have been approved. JSC “NIIturbocompressor n.a.V.B.Shnepp” together with JSC”Kazancompressormash” have proposed methods for retrofitting of widely used at JSC”Sibur” production facilities 4 ГЦ 2-109/18-76 compressor plants. Positive results of КЦ -102/1,2 process train modernization using the state-of-the-art 4 ГЦ 2-184/13,5-76 pressure casings show the Customer that with small expenses and on a tight timetable it is possible to achieve considerable results without any suspension of the main process production