전기부문 실적공사비 단가 축적 운영 방안
박민영, 장영길, 서순석 et al. · 대한전기학회 학술대회 논문집 · 2009
The costs accumulation by Historical construction costs in the electrical construction have to be operated gradually from construction order institution by possible fine quality costs accumulation and operated side by side with a trial the cost accounting process. To achieve gradually accumulated work sections of announced actual costs at a management agency is a desirable method that removes a negative elements at early stage of the system. It has the actual construction cost controlling agency and execution plan a conference with the ordering agency ordering method and history characteristic and the trial base of the universal drawing as to the controlling agency, is needed for the comprehensive system management.