장항선 선로 법면에 건설된 철도보강노반의 장기 침하계측
김웅진, 김대상, 이동호 et al. · 한국철도학회 학술발표대회논문집 · 2014
The long-term measurements (9 months) was performed to evaluate the settlement of the reinforced subgrade constructed on the slope of Jang-Hang Line and interlocking settlements of the adjacent tracks. The reinforced subgrade with 11m wide was constructed on the railway slope which had been damaged by rain fall. The ground of the foundation of the rigid face wall was replaced with cement-mixed gravels to improve the bearing capacity and reduce settlements. The measurement points were 1 on the ground, 4 on the surface of the subgrade, 12 on the adjacent tracks. From the analysis of measurement data, the estimated final residual settlement was 10mm. It was found that the periods for settlements to converge were 1 month for the ground, 1.5 months for the surface.