해안연약지반에 성토 후 인접지반의 굴착에 따른 측방유동 검토

김재홍, 임은상, 윤중만 et al. · 한국지반환경공학회 학술발표회논문집 · 2011

Incheon area of soft ground in the form of man-made island in the embankment with no ground improvement was performed. After filling in the fresh water around embankment enforcement was due to operate as an island, adjacent to the embankment caused by the ground deformation caused by uplift in the ground for the formation of a number of excavation is needed. Stability of the excavation for the formation of channels for review to determine ground conditions to explore the electrical resistivity were performed according to the composition of an artificial island was reviewing consolidation settlement. In addition, for the formation of channels for the flow by examining the lateral excavation, even if performed due to the embankment body parts were not affected.

Cited by 0 works.

Authors