두 단계 조립시스템에서 총 가중완료시간을 최소화하는 일정계획문제

윤상흠, 이익선, 이종협 · 2007

This paper considers a scheduling problem to minimize the total weighted completion time in the two-stage assembly-type flowshop. The system is composed of multiple fabrication machines in the first stage and a final-assembly machine in the second stage. Each job consists of multiple components, each component is machined on the fabrication machine specified in advance. The manufactured components of each job are subsequently assembled into a final product on the final-assembly machine. The objective of this paper is to find the optimal schedule minimizing the total weighted completion time of jobs. Three lower bounds are derived and tested in a branch-and-bound (B&B) procedure. Also, three heuristic algorithms are developed based on the greedy strategies. Computational results show that the proposed B&B procedure is more efficient than the previous work which has considered the same problem as this paper.

Cited by 0 works.