발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향

강추원, 류복현, 최태홍 · 터널과 지하공간 · 2014

In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is “Blasting design and construction guidelines to road construction” by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Cited by 0 works.