원예시설 난방원으로서 천부지열히트펌프시스템과 심부지열 비교
류연수, 박미란, 김진욱 · 한국태양에너지학회 추계학술발표회 논문집 · 2015
From 2010, geothermal heat pump system using shallow geothermal started to be introduced as a heating system of horticultural facility by cost of equipment support of government. In the last 5 years, greenhouse that was introduced geothermal system has 201 places(132.8ha) with 108,467㎾. In this study, we analyzed equipment and operation of shallow geothermal heat pump system that is currently operating. In addition, we evaluated it by comparing deep geothermal with shallow geothermal system. 1) Government funding is 1,638,000won per installed capacity(kW) of shallow geothermal heat pump in 2015 Agriculture Energy Utilization Efficiency Project. As a result of investigating the five facilities, the expense ratio of each process was 38% of borehole, 33% of heat pump facilities, and 29% of subsidiary facilities. Therefore, an estimated cost of borehole was 622,000won/㎾, 541,000won/㎾, and 475,000 won/㎾. 2) Shallow geothermal facilities are system for supplying energy after increase(40~50℃) the temperature of low temperature water(about 10℃) with heat exchange using a heat pump. Operating costs are reduced by about 70% than oil boilers but it was found that initial investment, energy prices, cost of repair are large. In addition, additional land is needed for the installation of underground heat exchanger corresponding to the heat load. In the case of greenhouse with 5,358m2, 48 holes with 900m2 were installed and in the case of greenhouse with 19,561m2, 174 holes with 5,000m2 were installed. We realized that it was necessary to secure additional land(17~25%) of greenhouse areas for the borehole installation. 3) Deep geothermal facilities are system for supplying energy that has acquired the high temperature of at least 50℃ from 1~3.5km or more drilled geothermal without a heat pump. It will just be expensive depending on the drilling depth. It is possible to reduce the facility costs and operation costs because required site is small and heat pump equipment is not required. 4) As a result, it is necessary to measure construction cost of borehole and equipment cost of heat pump in shallow geothermal system against construction cost of borehole in deep geothermal. In addition, evaluates electricity bill and maintenance costs, it is necessary to design a reasonable deep geothermal system. Deep geothermal system is required consideration of various technical methods as greenhouse using the cooling is increased in summer.
Cited by 0 works.