Front-Jacking공법에 의한 대전역사 하부 관통사례

김용일, 황낙연, 정두석 et al. · 한국암반공학회 학술대회 및 세미나 자료집 · 2006

The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of ground. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

Cited by 0 works.

Authors