호남고속철도 장경간 강아치 교량의 설계

한중기, 성근열, 김동창 et al. · 한국철도학회 학술발표대회논문집 · 2009

During the execution of Honam high speed railway Project, we need the long span arch bridge that can passage through 260 meter length, crossing the Cheonan-Nonsan expressway at a 168 degree angle. There is a restriction for guaranteeing the passage height of the expressway more than 5.0 meters, maintaining vehicle traffic on the expressway during the construction of both the superstructure and substructure, and keeping a landmark for that area. We compare several types of bridges with each other overcoming the restriction, and make the structural safety of the arch bridge satisfied. We also do analyze the limit condition of vertical acceleration on deck, twist per unit length of deck and vertical displacement through the execution of the dynamic behavior analysis. Therefore we make sure the safety of the rail through the analysis of the stability of continuous welded rail track under thermal load. In this research, we try to introduce the design technique on the high speed railway bridge crossing

Cited by 0 works.

Authors