경전선 고속열차 직결운행에 따른 파급효과 연구

오윤식, 홍천희, 나강운 · 한국철도학회 학술발표대회논문집 · 2010

KORAIL Double tracking project to the Kyeongjeon line will be completed by 2015, which will connect Busan, Samrangjin, Masan, Jinju, Kwangju. Which project(total length 306.6km) has been doing from the two ends, Young-Nam, HoNam respectively. For the case of Young-Nam, which consists of total length 95.5km and that will reduce the conventional distance(101.4km) to 95.5km, namely 5.6km cut down. Prior to the complete inauguration, The route between Samrangjin and Masan will be double tracked and high speed train operated by 2011. If that happen, Kyeongjeon line will be more competitive public transportation mode, consequently, I will analyze operating time among modes and spreading effect by direct connecting of Kyeongjeon line.

Cited by 0 works.

Authors