초기 레일연마 품질향상을 위한 검측방법 제안

임상민, 김인재, 이동호 et al. · 한국철도학회 학술발표대회논문집 · 2010

Initial rail-grinding of new construction of railroad is divided two works. One of two is preventive-grinding works which is removing a ferrite section existed under 0.2~0.3mm from surface of rail and the othere is corrective-grinding as to remove wave-wear by some kind of foreign body or etc. Rail-grinding is the great technique of track facility to be managed a surface on contact of rail and wheels and also fatigue of rail effectively through having of a optimized rail cross-section. This research has been studied to propose of inspection-methods to improve initial rail-grinding quality through many experiences and cases.

Cited by 0 works.

Authors