Итеративный подход при построении геологической модели на примере девонских отложений Гаршинского месторождения

R.O. Kornikov, М.А. Грищенко · Proceedings · 2015

Summary The first stage is the evaluation of the degree of knowledge, the quality, and applicability of the original data in order to identify the most significant geological uncertainties, and generate the studies program and a response plan for addressing the challenges and eliminating the uncertainties. The second stage is based on the response plan in the first iteration, with the uncertainty analysis of the first iteration, new drilling data, evaluation of the error rate in new wells, and evaluation and adjustment of the geological model based on the results of history matching of the flow simulation model within the first iteration. The advantages of this approach versus the standard method involve the operational account of new data and creating a list of recommendations for additional exploration at an early stage of model building. At the initial stage, the understanding of the degree of knowledge, challenges, time and labor costs required for the construction of the geological model reflecting the geological environment of the simulated target are formed. The report describes a case study of Garshinskoye field, where this work was carried out, it focuses on further planning of work based on the iterative approach; also, it describes the identified challenges and approaches to address them. A studies program was generated and executed which helped to solve a number of challenges, and significantly improve the knowledge level of Garshinskoye and the neighboring fields. The iterative approach allowed to adjust the drilling program and to save money for the company at an early stage of modeling. The report describes the procedure in more detail.

Cited by 0 works. doi:10.3997/2214-4609.201413983

Authors