호남고속철도 파일슬래브구간의 장기침하 분석
이일화, 이성진, 이수형 et al. · 한국철도학회 학술발표대회논문집 · 2014
Pile-slab method had been applied to Homan high-speed railway as 940m at first. The purpose of pile-slab structure is to restrain the soft ground settlement within design criteria. The slab distribute embankment load horizontal direction and the pile transfer to bedrock vertical direction. In this present paper, it evaluate settlement restrain performance during 700days using field data on high-speed railway roadbed which applied pile-slab structure. Settlement characteristics is evaluated with field data which are measured on natural ground and top of embankment considering the soil condition and construction process. Also, the settlement prediction is performed using a square root, Askaoka and hyperbolic curve during 60 years.
Cited by 0 works.