무인운전 전환에 따른 승무직원의 업무강도 및 스트레스 비교연구
임국현, 김현, 김진경 et al. · 한국철도학회 학술발표대회논문집 · 2015
In this paper, when switching the urban railway operated by attended operation to the unattended operation system, the work intensity and stress due to changing role of engineer are analyzed. Comparing work intensity and stress of crew staff of the Seoul Metropolitan Rapid Transit Line 8 being operated attended operation and of the Sinbundang line being operated unattended operation, and then the difference between the two groups are compared. As a result, work intensity and stress of unattended operating Sinbundang line crew staff both are analyzed by relatively low.
Cited by 0 works.