새만금 방조제 해측사면 계측관리 분석

강병윤, 김기년, 윤창진 · 한국지반신소재학회 학술발표회 · 2009

In this study is the tide Saemangeum embankment management and sea side slope behavior analysis, and surveillance and management of the numbers 1 and 3 tide embankments installed in each of the previous years was conducted. Results of the numbers 1 and 3 devices showed that sideways movement by the clinometers were slight, and in the case of the subsidence meter, efflux of find wire dredging caused by damage to the filter mats resulted in serious subsidence at the STA. No. 20+30 row 1 EL+3.0m, EL-6.0m, row 2 EL-2.0m points of device number 1. Results of the piezometer showed that changes in the tide levels at low and high tide caused changes in water pressure at regular intervals. Therefore, it is established that tide embankments are stable in all areas save the STA. No. 20+30 point of device number 1.

Cited by 0 works.