It is inevitable choice to construct concrete slab track on embankment to cut down construction cost. It is expected that this trend will be continuded for some times. Residual settlement after construction of track is a very important factor to construct concrete slab track on embankment. Residual settlement largely affected by construction cost and period gives effects on the track quality, running safety and riding comfort. This paper suggests ways to enhance quality of concrete slab track with the minimization of residual settlement in the stages of design and construction. And also, to determine the range and level of reinforcement of concrete slab track, it is checked vertical curve condition to allow 60mm residual settlement under the condition of basin type settlement.