도시철도 인접지반 공동발생시 노반 삼차원 안정성 평가
엄기영, 박영곤, 김호석 et al. · 한국철도학회 학술발표대회논문집 · 2015
In recent days, underground excavations and water pipeline damages have caused a lot of soil losses especially in urban areas. For instance, large-scale cavities were found at the roads adjacent to both Seokchon subway station and Incheon subway line No.2. Since a lot of people use urban subway every day, a big accident leads fatal life loss. Therefore, urban railway should be secured and the risk factors influencing on the railway stability should be examined. In this study, a three-dimensional finite difference model using the commercial program FLAC3D is adopted to estimate the stability of railway roadbed adjacent to cavity as a train loading is applied. Roadbed settlements were estimated, with respect to various depths, widths, and lengths of the cavities located at a 20-m distance from the center of railway, to examine the stability of the roadbed.