혹서기 장출위험 저감 및 정시운전확보를 위한 합리적인 장대레일 설정방법
박옥정 · 한국철도학회 학술발표대회논문집 · 2015
Korean National Railroad has encouraged to convert main lines by continuous welded rail (CWR) since 1966. The temperature change is the most opportune for CWR maintenance. In this point of view, This thesis comes to the following conclusions as the results by analyzing a series of meteorological datasets, rail temperature measurements and various researches for the CWR to examine atmospheric temperature across the principal railroad stations and level of CWR SFT. In case the lowest temperature of the rail SFT is elevated from +45℃ to +50℃, it is expected to increment of available time and efficiency for CWR maintenance work, cost reduction due to monitering of the buckling, and the advantage to Korea Train Express (KTX) to run on time with diminished slow speed section.
Cited by 0 works.