철도노반의 터널구간 횡단기울기 조정 연구
박상구, 이동렬, 허상원 et al. · 한국철도학회 학술발표대회논문집 · 2015
In the railway tunnel section, the cross grade on the roadbed is designed for drainage in case of cleaning with water to remove dust and other inflow of water. To cope with the shift from ballast track to concrete track owing to efficient maintenance and low life cycle cost, we have thoroughly analyzed related design and construction works to verify the necessity of the cross grade (2%) on the sub-ballast. The results of the study will be used to revise the standard cross-section of tunnel and related guidelines in order for enhanced constructability and cost saving of roadbed and track construction.
Cited by 0 works.