재공 재고 요소를 고려한 부하평준화 프로젝트 스케줄링

이성진, 김한국, 박진우 · 한국시뮬레이션학회 학술대회 논문집 · 2012

Many researches of project scheduling have been conducted in various fields. Most of these studies considered single criteria objective, such as minimization of makespan or maximization of revenue, for building an efficient schedule. Thus, they have difficulties to apply real situation that have multi-criteria objective. In this research, I deal with the load leveling problem considering WIP (Work-in-Process) inventory to propose a scheduling algorithm that reflects a realistic situation occurring in the current industry. The algorithm, named integrated scheduling algorithm, seeks to reduce the fluctuation in the pattern of resource usage taking into account the WIP inventory in the stage of scheduling. In this context, I propose an integrated index considering both the load leveling and the duration of WIP inventory, and solve the problem by an exact method. Moreover, users can customize the algorithm depending on their situation. In the algorithm, integrated model of relational constraints is applied to lighten the burden of computational cost.

Cited by 0 works.

Authors