변압기 생산 공정의 일정계획 알고리즘 성능 평가 및 개선

전성범, 김성훈, 박진우 · 한국시뮬레이션학회 학술대회 논문집 · 2013

The industrial transformer market has a characteristic of flow shop production system by specific requirements such as due date, voltage, and capacity. In this customized production environment, on-time delivery has a major influence on the competitiveness of company. From the manufacturing factory’s standpoint, it is also important to minimize the production cost like work-in-process inventory holding cost and transporting cost between stages by the due date that a company promised their clients. Therefore deriving a schedule to minimize both tardiness and production cost is essential for improving business competition. However the complexity of flow shop problem and a lot of constraints in the real world make it harder to solve these problems within a reasonable time. In this study, heuristic algorithms for solving these problems within a reasonable time are proposed. And the performance measures of these algorithms such as tardiness are compared with each other by the simulation research based on the real production data.

Cited by 0 works.

Authors