“梯-潭”型泥石流排导槽消能特性研究
李云 · 2015
Drainage channel is one of engineering mitigation measures used in deposition zones, including the V shape debris flow drainage channel and ladder shape debris flow drainage channel. Imitating the step-pool system in mountain rivers as prototype,referring to the energy dissipation theory of ladder shape debris flow drainage channel,and taking theengineering practice of debris flow drainage channel with box configuration in Xiaogangjian Gully into consideration,the debris flow drainage channel with step-pool configuration(DCSC) is proposed in accordance with demand to decrease the slope gradient and control the flow velocity in earthquake areas. The DCSC is available for small watershed gullies with high gradient,abundant loose mass and occurrence in high frequency,combining the capacity of energy dissipation with the capacity of speeding up debris flow to deliver. The characteristic in longitudinal gradient is analysed by formula derivation.The bulk density,gross of the process,longitudinal gradient are changed in the model exeriment and the shape parameters H-L-l0 are changed in the numerical simulation.Before to discusse the energy dissipation mechanism the dynamicbehaviour of the channelized debris flow is revealed.The energy dissipation mechanism is different when fluid volume weight creases.The detailed analysis is carried out on the energy dissipation rate,to understand the factos such as bulk density,gross of the process,longitudinal gradient and shape parameters H-L-l0's effect to energy dissipation rate,and to get the range of energy dissipation rate in different longitudinal gradient.Based on the above sdudy,the preliminary design method of shape parameters are obtained. (1)The characteristic in longitudinal gradient The DCSC has the function of decreasing slope gradient,and the relationship between i and i0 satisfies a binary quadratic equations with parameters acceleration index a and the deceleration index b.When a=0,b>0,H is low,the channel is fully overspreaded with concrete;When a=0,b=0,H is high,the channel is filled with ladder shape;When a>0,b>0,H is 3-5meters,the channel is filled with step-pool configuration. (2)The dynamic behaviour of the channelized debris flow The fluid fall into the pool with the turbulence occuring,then the fluid roll out of pool like hydraulic jump,in other words,the fliud move in a peed up-speed way,which will transport the channelied debris flow smoothly. For diluted debris flow,the resistance is mainly from the lowwer mutual collision of sediment and the turbulence of upper water,while for viscous debris flow,the resistance is mainly from viscous drag and the friction of blocks in pool. For water,the n is 0.0128~0.0277;for hyper-concentration flow,the n is 0.0117~0.0451;for diluted debris flow,the n is 0.0109~0.0588;for viscous debris flow,the n is0.0443~0.0807. The correctionaljet distance: For viscous debris flow, 0.55≤ψ≤0.70;for diluted debris flow ,0.70≤ψ≤0.88;for hyper-concentration flow,0.90≤ψ≤0.95. (3)The characteristic of energy dissipation When debris flow go trough the DCSC,the energy dissipate in three ways.Energy dissipation rate by fluid fall is about 40%~50%,energy dissipation rate by turbulence in the pool is about 20%~30%,and energy dissipation rate by the friction of blocks in pool is about 10%~20%.When the volume flow rate is high,the step-pool configuration in the DCSC is submerged,namely the surface roughness decrease,the step-pool configuration can not work,leading to the energy dissipitation rate decrease to about 20%. When the lognitudinal gradient value is high,the energy dissipation rate goes down,in some cases the energy dissipation rate firstly goes up and then goes down,which reveals the different energy dissipation mechanism in different lognitudinal gradient.The gross of the process has little effect on energy dissipation.When the bulk density crease,the energy dissipation rate firstly goes down and then goes up. For wat
Cited by 0 works.