The paper considers the problem of repair of ship hull afloat by the example of motorships like Nevskiy type (project Р-32БУ). The solutions of a number of the operational tasks such as ensuring the resistance to flooding of the vessel when repairing and hull structural strength at various stages of repair works are presented. The values of residual stresses in conjunctions of the hull, which appear after repair works, are analyzed. On the basis of the calculation of draft at forward perpendicular and draft at aft perpendicular, draft differences and the elements of metacentric stability the necessity of installation of temporary plugs in the shipborne drain passages that do not let free access of water into hull double bottom space and ensure the resistance to flooding is explained. As a ship hull during repair works afloat is under load due to weight forces and forces of buoyancy, bending-moment curves and shearing force curves are received. In order to ensure the overall strength of the hull, the values of possible shear stresses at critical points, main stresses at top edges of gunwale strake and stresses in conjunctions of the ship hull before and after repair works. During repair works residual stresses can appear in the ship hull, which can lead to reduction of assurance factor for fatigue strength and arising of corrections to reduction factor of longitudinal ribs, which can cause loss of stability of stiffening ribs. The calculation of possible residual stresses during consequential and simultaneous replacement of drain passages was made. On the basis of the calculations the recommendations for the development of the technological process of replacement of drain passages of the motorship like Nevskiy afloat are given.

Cited by 0 works.

Authors