수치해석을 통한 터널내 구조적 균열 연구

박재영, 박광림, 이태형 et al. · 2013

For this study, Inspection and test was carried out in Tunnel. After this process, Numerical Analysis was accomplished by 3D. A result of inspection and test, It couldn't find the reason why the upper slab crack was detected. The result of 3D Numerical Analysis, The reason was found that the Demage on upper slab was caused by moment change. The Moment was changed by column interval transition. To figure out the cause of cracks, we are using FEM. This Study can help developing designation and maintenance about Tunnel.

Cited by 0 works.