정거장 하부를 초근접 통과하는 비개착공법 설계 사례
이호, 권오식, 장우선 et al. · 한국철도학회 학술발표대회논문집 · 2016
The purpose of this study is planning a station which has a multi-level crossing with the existing station. A passageway to the waiting area and the shortest transfer were considered and to secure convenience of platform users, stability of the existing station’s foundation and constructability, non-open cut method was planned. To apply optimum non-open cut method, 3-dimensional ground properties were analyzed and construction status of station’s foundation was reflected in planning. In consideration of user’s usability, UPRS is applied to non-open cut method for a passageway. HUS is applied to non-open cut method for a platform in consideration of securing constructability and stability of the exiting station’s foundation. In order to procure stability of an operating station and non-open cut method, the shortest extension was designed. For foundation stability evaluation considering load effect, excavation effect and groundwater effect, three-dimensional numerical analysis with the consideration of construction phase and model test were performed.
Cited by 0 works.