고속철도차량 동력전달 구성품의 경제적 오버홀 주기 산정에 관한 연구
정진태, 김진돌, 김철수 · 한국철도학회 학술발표대회논문집 · 2015
High-speed rail vehicle there and enforce the PM (Preventive Maintenance), which performed maintenance in accordance with the system CM is performed after failed (Corrective Maintenance) and a predetermined period to maintain availability over a certain as a repairable system, the price of the components are expensive and because it requires a high reliability with a focus on keeping the best available at the lowest cost for establishing a maintenance policy it is of utmost importance. Domestic rail vehicles during the first introduced into KTX RAMS (Reliability, Availability, Maintainability, Safety) has conducted a reliability centered maintenance is applied by one of the scientific method to the KTX-RCM system maintenance. In this paper, we study the optimization of high-speed vehicle maintenance parts using RCM.
Cited by 0 works.