남강 중권역의 수자원 부존량과 용수 수요량의 비교 평가

최영완, 김용완, 박정원 et al. · Journal of Agriculture & Life Science · 2010

Water demand and resource at a watershed scale were investigated to prepare for long-term water planning of the Namgang sub-basin. The quantity of water resource was defined as average annual runoff by a simple Tank model with three serial tanks, and water demand for public, industrial, agricultural and the other uses was determined using the per-unit method employed in the Water Vision 2020, the Ministry of Construction and Transportation. The results showed that total amount of water resources in the Namgang sub-basin was estimated as about 935,414×10 3 ㎥/yr for a 10-year period from 2000 to 2009 and the water withdrawals in public, industrial, agricultural and other sector were derived as 105,493×10 3 ㎥/yr, 32,686×10 3 ㎥/yr, 243,194×10 3 ㎥/yr, and 81,615×10 3 ㎥/yr, respectively. In addition, the Namgaram Inno-city project could increase the overall water demand by 17,156×10 3 ㎥/yr due to the population influx.

Cited by 0 works.

Authors